Sparkford, Somerset, UK. 31st May 2023. General view from the air of the £140M National Highways scheme to dual the A303 between Podimore and Sparkford roundabouts. The construction of the new dual carriageway is forecast to be finished by spring 2024. Picture Credit: Graham Hunt/Alamy Live News
RMID:Image ID:2R52CGB
Image details
Contributor:
Graham Hunt / Alamy Stock PhotoImage ID:
2R52CGBFile size:
34.3 MB (1.4 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
3000 x 4000 px | 25.4 x 33.9 cm | 10 x 13.3 inches | 300dpiDate taken:
31 May 2023Location:
Sparkford, Somerset, UKMore information:
This image could have imperfections as it’s either historical or reportage.